Tuesday, 9 October 2007

At the End of Summer:

Hanging at Last

Looking up from below




Chimney exit detail

Looking out the door

First Fire

Transport to Site

Closing the Shell

Jesse & Francois lift in the chimney

Standing up

Securely fixed

Lowering down the top


CNC cut forms

Assembled beneath last year's pavilion

Architecture Without Architects

Daniel and Francois planking

The big flip

The Floor

The floor planks laid out

Early morning work

The Wood Stove

a reconstructed gas tank

Testing the rough stove

In situ

The Net

Margaret tying knots

The polyhemp rope is from nearby Bridport

Hanging the net

Concept Models

Jesse's rough model

Net concept

Breakfast at Hooke Park

Local Inspiration